GA4, GTM and Analytics Consulting
If your tracking is wrong, every marketing decision you make is wrong. We fix that.
- GA4 setup, audits, and ecommerce tracking
- GTM implementation and container rebuilds
- Looker Studio dashboards built for decisions, not decoration
Your analytics is quietly wrong (yes, yours)
You cannot optimise what you cannot measure. That part everyone agrees with. The part businesses miss is that a fair chunk of what they are currently measuring is wrong. Not slightly wrong. Wrong enough that decisions being made from it are probably worse than decisions made from a coin flip.
We audit analytics for a living, and in roughly 80% of GA4 implementations we look at, one or more of the following is broken: conversions are double-counted (pixel fires twice because someone installed the same code in two places). Events fire on the wrong trigger (a "form submission" event firing on page load). Cross-domain tracking is broken (sessions restart when users move from marketing site to booking system). iOS conversions are missing because consent mode v2 was not set up properly when it became mandatory. Traffic sources are misattributed because the UTM parameters are wrong or the referral exclusion list is not populated. Ecommerce tracking is missing product-level data so revenue is reported but not tied to products.
Each of these individually seems like a small technical issue. Stacked on top of each other, they mean the entire analytics picture is a distortion of reality. Our SEO and analytics team uses Google Tag Manager and Looker Studio as the foundation, configuring tracking for Australian businesses since 2008 across ecommerce, professional services, healthcare, and franchises, and Semrush Agency Partner credentials behind the work. The same reporting underpins Google Business Profile optimisation.
What success looks like

For a Parramatta ecommerce retailer, broken checkout tracking meant product-level performance was invisible. We fixed the enhanced ecommerce implementation, surfaced hidden bestsellers, and the result was a 38% ROAS improvement within 90 days.
For a Northern Beaches service provider, duplicate GA4 events were inflating lead numbers and making campaign decisions unreliable. We cleaned up the tracking and rebuilt dashboards. Lead reporting accuracy improved from 62% to 98%.
For a Sydney franchise brand, there was no way to see which locations were driving ROI and which were draining budget. We built a multi-location GA4 setup tied to suburb-level dashboards. The outcome was clear ROI per region, enabling smarter budget allocation across the network.
For Vocus, a national telecommunications enterprise, GA4 was undercounting email traffic by 77%. Missing custom channel groupings meant only 409 of 1,824 email sessions were being attributed. We rebuilt the channel configuration, fixed self-referral contamination, and created dedicated AI chat tracking across 16 platforms. Email attribution accuracy improved 4.5x.
For Mate Telecommunications, self-referrals were inflating session counts, landing page data was missing for 7.47% of sessions, and ecommerce funnel tracking only captured the final purchase event with no visibility into the steps leading to it. We resolved the self-referral issue within 24 hours of audit delivery and established full ecommerce funnel visibility for the first time. For the search side of measurement, our Search Console setup guide walks through a clean setup.
Who we help in Sydney
Our analytics services support businesses that cannot afford to make decisions based on bad data.
Why Sydney brands choose Click Click Media

Businesses across Sydney partner with us because we do not just install GA4. We build reliable tracking systems that tie directly to ROI. The same dashboards inform paid search and PPC decisions, so SEO, ads, and analytics speak the same language about what is actually working. When the data shows an authority gap, we close it with backlink building services.
92% client and staff retention
The analyst configuring your GA4 in week one is the same person reviewing your dashboards in month twelve. A 92% retention rate across clients and staff means no handoffs, no knowledge loss, and deep understanding of your data. Our clients rate us 4.8 on Google from multi-year engagements.
In Sydney digital since 2008
We have seen every GA4 migration mistake, GTM disaster, and reporting mess. We know how to fix them because we have been configuring tracking for Australian businesses since 2008.
Compliance-first approach
Privacy, consent, and data integrity baked into every build. We configure consent mode, cookie banners, and server-side tagging so your tracking is accurate and compliant.
Dashboards in plain English
Revenue, leads, and conversion data at the centre. Not vanity metrics, not 40-tab spreadsheets. Reports your leadership team can read without a translator.
No lock-in contracts
Month-to-month from day one. Analytics projects can run as a one-off engagement or ongoing retainer. You choose the scope that fits.
Our analytics and dashboard services

Google Analytics 4 setup
We create a robust GA4 foundation built around your business goals, ensuring every user action is tracked correctly. This includes event-based tracking for pageviews, clicks, form submissions, video plays, and scrolls, enhanced measurement configuration, ecommerce tracking for Shopify, WooCommerce, and Magento, plus custom dimensions, metrics, and data streams for advanced analysis.
Google Analytics 4 audit
If your current GA4 setup is not delivering the clarity you need, our full audit uncovers and corrects issues. We validate event accuracy, tag structure, and reporting integrity. We identify gaps in tracking and data streams, provide clear recommendations to improve reporting accuracy, and debug GA4 and GTM conflicts that distort results.
Google Tag Manager implementation and audits
GTM is the engine behind scalable tracking, but misconfigured, it causes bloated tags, skewed results, or data loss. We handle GTM setup and clean configuration for scale and speed, tag sequencing and firing rules that improve reliability, conversion tracking for Google Ads, Meta Ads, and LinkedIn, plus debugging and QA via Preview Mode and Tag Assistant. Privacy-compliant tagging with consent management is baked in.
Looker Studio dashboards
We design dashboards for decision-makers, not data hoarders: clear, actionable, and tied to revenue. Real-time reporting across GA4, GSC, ad platforms, and CRMs. Executive-friendly summaries of traffic, leads, revenue, and ROAS. Custom filters for multi-location and franchise reporting. When Meta is one of those platforms, our Facebook ads agency works from the same numbers.
Ecommerce tracking and attribution
For Sydney retailers and ecommerce brands investing in organic growth, we build full-funnel visibility from ad click to order confirmation. Enhanced ecommerce tracking with clean product, category, and checkout data. Multi-touch attribution models to understand real ROI. Product-level margin tracking so you optimise for profit, not just volume.
How we deliver analytics projects

1. Discovery and audit
Deep dive into your GA4, GTM, and existing dashboards. Identify gaps, errors, and opportunities.
2. Implementation
Configure GA4 events, streamline GTM containers, and set up ecommerce tracking. Every tag is documented and tested.
3. QA and debugging
Validate everything with Tag Assistant, DebugView, and test transactions to ensure accuracy before going live.
4. Dashboard rollout
Build Looker Studio dashboards specific to your team: from executive snapshots to campaign drill-downs.
5. Training and governance
You are involved here: a walkthrough session where we show you how to read the dashboards and flag the metrics that matter most to your team. We equip your team with plain-English guides, changelogs, and ongoing governance so accuracy lasts beyond handover. Your analytics team presents a forward plan with ongoing support options.
What is included in our packages
Every project includes the essentials to ensure clean, trustworthy data.
- GA4 setup or audit: configured around your Sydney business goals with event validation.
- GTM configuration or container rebuild: with clear documentation and tag sequencing.
- Ecommerce tracking: for Shopify, WooCommerce, and Magento with product-level data.
- Looker Studio dashboards: for traffic, leads, sales, and ROI with real-time data.
- Ongoing optimisation and governance: with transparent reporting and team training.
Add-ons: multi-location reporting, advanced attribution modelling, server-side tagging, and CRM/ERP integrations.
Latest reviews
How we actually run analytics engagements

Every analytics engagement starts the same way: we inherit whatever state your tracking is in, do not pretend to understand it yet, and run a systematic diagnostic. The 3 phases below describe what that looks like in practice, with a monthly summary and direct senior access throughout.
Diagnostic audit.
We inherit whatever state your analytics is in, do not pretend to understand it yet, and run a systematic diagnostic. Every tag in GTM. Every event in GA4. Every custom dimension and metric. Every conversion definition. Cross-domain behaviour if applicable.
We validate tracked conversions against your CRM, booking system, or order data. In roughly 80% of audits, the numbers do not match. You receive a written audit document with every issue categorised by severity and remediation effort.
Remediation in staging, nothing touched in production without approval.
We build the fixes in a staging container or parallel property, validate them against real traffic, and present findings before promoting anything. You approve every change before it goes live.
For server-side tagging work, this phase includes the server setup, domain configuration, and side-by-side validation against client-side data for at least two weeks.
Retainer, handover, or one-off completion.
If you are engaging us for ongoing work, we move into retainer mode: monthly health checks, platform updates as Google releases them (which is constantly), new event implementations as your business evolves, dashboard updates. If you are doing one-off work, we document everything, run a 90-minute handover session with your team, and leave you with something your internal team or next consultant can actually maintain.
Analytics implementations age badly if they are not maintained, and we build ours to be handed over cleanly if that day ever comes. Our track record is published here.
Analytics Consulting Pricing
Analytics consulting pricing because the rebuild-your-GA4 market has been a mess since iOS 14. Ours is written down.
Standard GA4 + GTM implementation with dashboards: from $1,500 per month (excl. GST). Includes event configuration, container setup, ecommerce tracking, Looker Studio dashboards, and QA validation.
Custom packages for enterprise, ecommerce, or multi-location requirements are scoped after a free audit to ensure accuracy.
We have rebuilt GA4 and server-side tagging for ecommerce businesses running real revenue, and for smaller operations that just needed their attribution to stop lying. Both got the same engineering discipline. Sprint Engine, our internal SEO workflow platform, runs on the same tracking architecture we deploy for clients.
The analytics lead scoping your engagement is the one implementing the container changes and training your team afterwards. We care that you trust the numbers, which is why we document the measurement plan in plain language. Call us. If your current tracking is broken, we can tell you inside 20 minutes.
All pricing is indicative and excludes GST. No lock-in contracts. Month-to-month from day one.
FREE Tracking Audit + Discovery Session!
Limited spots | Offer terms apply
Last updated: October 31, 2026
Results, not promises
For more in-depth case studies, see our client results library.
BAC Removals
Central Coast NSW, Local Services
Vocus
National Telecommunications, Enterprise
Mate Telecommunications
Consumer NBN and Mobile, Telecommunications
Meet your analytics team
Your GA4, GTM, and dashboards are configured by the same analysts who manage SEO and performance campaigns for Sydney businesses, all in-house from our Norwest office.
Andrei Jach
Head of AI & Analytics | GA4, Conversion Tracking & AI
You make decisions on numbers you can trust. Andrei sets up and audits GA4, Tag Manager and conversion tracking, and finds out why a site lost rankings when nobody else can. 15+ years in digital marketing.
Adriel Santos
Head of Paid Media
More of your ad budget turns into revenue. Adriel has run Google Ads at CCM since 2015 and led the work that made CCM a 2024 Google Agency Excellence Awards finalist.
Data analytics and dashboards FAQs
Common questions from Sydney businesses about GA4, GTM, and dashboard consulting.
What is the difference between GA4 and Universal Analytics?
GA4 is event-based, which means every interaction can be tracked as a custom event rather than relying on sessions or pageviews. This gives you more accurate cross-device insights, cleaner ecommerce reporting, and far greater flexibility for analysis. Universal Analytics was sunset by Google in 2024.
Can you help if our GA4 property is already set up?
Yes. Many Sydney businesses have GA4 enabled but not fully configured. We review your setup, identify missing events or duplicate tags, and rebuild tracking where needed so your reports are accurate and decision-ready.
What is included in a Google Tag Manager audit?
A GTM audit covers everything from tag sequencing and firing rules to privacy compliance and load speed impact. We also debug misfiring tags and remove bloat, giving you a faster, more reliable container that supports accurate data collection.
Do you support Power BI or BigQuery?
We specialise in the Google analytics stack: GA4, GTM, and Looker Studio. These tools cover most needs for marketing performance, ecommerce tracking, and lead generation. We can recommend trusted partners for platforms like Power BI or BigQuery if your requirements extend beyond the Google ecosystem.
How long does it take to build a custom dashboard?
Most dashboards are designed, tested, and launched within 2 to 4 weeks once data is clean and integrations are in place. Complex builds that draw on multiple systems or require advanced segmentation may take longer, but we always provide a clear timeline upfront.
Can you connect dashboards with Shopify or WooCommerce?
Yes. We implement enhanced ecommerce tracking for Shopify, WooCommerce, and other platforms, then wire the data into your dashboard. This gives you visibility over product performance, checkout behaviour, and revenue in one place.
We migrated to GA4 early but features are missing. Why?
In most cases, early migrations left out custom events, ecommerce tagging, or consent configurations. We audit and repair these gaps so your GA4 property captures the right data streams and you are not left with incomplete reporting.











