Headline 'How to Win SEO & Google Ads for Manufacturers in Australia' beside an open guide, 9,900/mo searches and 196% revenue cards, and a factory with robotic arms and a forklift

Written by Andrei Jach, Senior Manager, SEO and Analytics Specialist at Click Click Media · Updated 1 October 2026

An engineer ready to ask for a quote searches by process, material or part, and SEO for manufacturers puts your capability page in front of that search. Australian manufacturing added $142 billion in value in 2024-25 and employs 868,100 people. It spans food and drink, metals and fabrication, industrial equipment, electronics and specialty production. Most of it is sold business to business, and a buyer can check your website long before sending a request for quote (RFQ).

Those buyers shortlist suppliers on specifications. A search such as Custom metal fabrication Sydney could come from a buyer at a builder, an engineer at a mining equipment firm or a student writing an assignment. The manufacturers that win the enquiry publish the tolerances, materials, machines and certifications a buyer needs to check. They put those details in plain text on a page built for that process.

This guide follows the order a spec-driven buyer works in. It starts with the product data and spec sheets they check, then covers how AI search reads that data and the proof buying teams look for. It ends with the Google Ads campaigns and tracking that turn searches into signed purchase orders.

The Australian Manufacturing Sector: Key Data
$142B
Value added by Australian manufacturing in 2024-25. That is up 4.6% on the year before, and fifth highest of the industries the ABS surveys.
ABS Australian Industry, 2024-25
868,100
People working in Australian manufacturing in February 2026, about 5.9% of the workforce.
Jobs and Skills Australia / ABS Labour Force, February 2026
90,879
Manufacturing businesses operating in Australia in June 2026, up 0.2% on a year earlier. Each one could compete with you for capability searches.
ABS Counts of Australian Businesses, June 2026
69%
Business buyers in a Gartner survey of 632 who found that a supplier's website did not match what its sales staff told them.
Gartner, June 2025, also reported by Mi3
Sources: ABS Australian Industry 2024-25; ABS Labour Force Survey, Detailed (February 2026) via Jobs and Skills Australia; ABS Counts of Australian Businesses, July 2022 to June 2026; Gartner B2B buyer survey (August to September 2024). Defence, energy transition manufacturing and advanced materials are growing faster than the sector as a whole. The federal Future Made in Australia agenda is also changing how government buys from compliant local suppliers.

Implement this playbook with AI

Opens your assistant with this playbook and seven questions about your business: services, area, website and ads. It then writes your keyword map, page plan and Google Ads starter build with your details filled in.

Copy the prompt for Gemini, Grok or any assistant that cannot open a prefilled link. The prompt points at this page, which is also served as Markdown to assistants that ask for it.

CCM Research: What Manufacturing Searches and Ads Show

Finding 1: no manufacturing ad offered social proof

In CCM’s analysis of Semrush ad history for five Australian manufacturing searches from September 2025 to August 2026, none of 33 ad records from 23 advertisers carried a review count, a star rating or a named client. Quotes were the most common offer, mentioned in 15 of the 33 records. A review score, a named client sector or a certificate number would set your ad apart, as long as the landing page shows the same proof.

Source: CCM analysis of Semrush ad history, Australia, September 2025 to August 2026

Finding 2: offshore factories bid on Australian CNC searches

On cnc machining services, 6 of the 8 advertisers in CCM’s analysis of Australian Semrush ad history used non-Australian domains, and one ad read “ISO 9001 Certified Factory in China”. Those ads appeared in 5 monthly snapshots between December 2025 and August 2026, giving 13 ad records. A local machine shop is competing with overseas factories for the same click, so state your lead times, site visits and any Australian-made status you can prove.

Source: CCM analysis of Semrush ad history, Australia, September 2025 to August 2026

Finding 3: supplier searches return supplier websites

In CCM’s captures of six Australia-wide supplier searches on 3 September 2026, supplier websites held 48 of the 60 page-one organic places (80%), and no agency page appeared in the top 10. Your rivals on these searches are other suppliers’ capability pages. A page that sets out clearer specs than theirs gives you the better chance of ranking.

Source: CCM search captures, Australia, 3 September 2026

Method: Finding 3 uses CCM’s Australia-wide desktop captures (DataForSEO, Google location 2036) of six supplier searches on 3 September 2026: contract manufacturers australia, cnc machining services, metal fabrication sydney, injection moulding services, clothing manufacturers australia and steel fabrication. Page one means the top 10 organic results, and a supplier website is the business’s own site rather than a directory, marketplace or media page; two further captures, an agency search and a definition search, are left out. Findings 1 and 2 come from CCM’s analysis of Semrush ad history for the same searches, using monthly snapshots taken on the 15th from September 2025 to August 2026 (contract manufacturers australia returned no ads). Semrush keeps one row per advertiser per month, which we count as one ad record.

SEO for Manufacturers: How Spec-Driven Buyers Choose Suppliers

Manufacturing searches come from business buyers, and they are usually close to a purchase. Typical searchers include an engineer sourcing a precision machined part, a product developer looking for a contract injection moulder and an operations manager comparing packaging suppliers. Each looks for a “manufacturer” in different words. The page that matches the exact search with specs a buyer can check gets the RFQ.

Buyers now do more of that checking on their own. The same Gartner survey found that 61% of buyers prefer to buy without a sales rep, as Mi3 reported. That means many buyers judge you on the capability page before they speak to anyone. If it lists the wrong tolerance or an expired certificate, the buyer sees the error before your estimator sees the drawing.

Procurement searches carry qualifiers

A real buying search names a process, material, tolerance or volume. “Custom CNC machining Sydney quote” usually comes from a buyer, while What is CNC machining comes from a student or a curious engineer. Build pages for the first kind, and use articles to support them. That split is the starting point for SEO services on any manufacturing site.

From our client work

Zebra Home is a homewares supplier that had only sold wholesale. Since working with Click Click Media and moving into direct sales, it has recorded 196.33% overall revenue growth, as the Zebra Home case study reports. Zebra Home sells homewares wholesale and does not make them. A manufacturer moving from trade-only selling to direct enquiries faces the same task.

Tacca Industries makes thermoformed packaging in Moorebank, NSW. We rebuilt its six-page brochure site around the choices its buyers make. In the case study’s words: “Thermoforming and Extrusion, the two things Tacca actually sells, finally have dedicated pages to rank and convert on.” Tacca’s own team can now update the site without asking a developer.

Manufacturing Keywords by Process and Material

Hand holding a phone with Google suggestions for custom manufacturing company, including cnc machining services Sydney and sheet metal fabrication Australia

Manufacturing keywords name a process, a material, an industry or a type of contract. In CCM’s analysis of Google Keyword Planner data (Australia, 12 months to August 2026), cnc machining averages about 9,900 searches a month. Metal fabrication and steel fabrication average 2,900 each, injection moulding and sheet metal fabrication 1,600 each, and contract manufacturing about 210.

Process-Specific

CNC machining [city]
injection moulding Australia
sheet metal fabrication [state]
precision turning [suburb]

Material-Specific

aluminium fabrication [city]
stainless steel fabrication
plastic moulding [state]
composite manufacturing

Industry Vertical

defence manufacturing Australia
food grade manufacturing [state]
mining equipment manufacturer
medical device manufacturer

Contract Manufacturing

contract manufacturer Australia
OEM manufacturer [state]
private label manufacturer
contract assembly [city]

Custom / Bespoke

custom manufacturer [state]
bespoke industrial parts
prototype manufacturer [city]
low volume production run

Procurement Research

manufacturing quote Australia
local manufacturer [state]
Australian made [product]
domestic supplier [material]

Buyers tend to search in one of two patterns, process + place or material + process, and each pattern needs its own page. A keyword and meta planner keeps that map in one place. Broad capability terms pull in mixed traffic and rarely lead to a quote.

Spec Sheets as Indexable Product Data

AUSMFG homepage on a laptop and phone, headlined Precision Manufacturing Solutions with a factory, forklift and Request a Quote button

Put your specs on web pages, and keep the PDF as a download. Google can index PDFs, which are on its list of indexable file types. A PDF, however, has no menu, RFQ form or links to your other pages. A buyer who lands on one from search has nowhere to go next. Also check that a login or a script is not hiding your product catalogue or capability tables from Google.

  • Give each product or process its own page. Put the key specs in a text table: material grades, tolerances, working envelope, finishes, certifications and typical lead time.
  • Link the PDF from that page for engineers who want to file it.
  • Use the same part numbers and model names on the page as in the PDF and your quotes. A buyer who searches a part number will then land on the page.
  • Link each spec page to its process page and the RFQ form.
Worked example: the same spec, two ways

Weak: “We offer high-quality precision machining with tight tolerances for a range of industries.” Nothing here can be checked or matched to a search.

Strong: “5-axis CNC machining in aluminium 6061 and 316 stainless, working envelope 1,000 x 600 x 500 mm, tolerances to plus or minus 0.01 mm, ISO 9001 certified (certificate number on our quality page). Typical lead time three to four weeks. Send STEP or IGES files with your RFQ.” Each figure in it can be checked against a drawing or a certificate, and an AI answer can quote it as written.

Capability, Process and Industry Pages

Manufacturing website on a laptop and phone surrounded by page layouts showing CNC machines, industry photos, machined parts and a contact form

A manufacturer needs a page for each process it wants to quote on and each industry it serves. Add a quality page and a short RFQ page. Each one should answer the buyer’s next question before they ask it.

PageFocus keywordWhat to include
Main capability page[process] manufacturer [city/state]What the process does, your machines and their specs, materials, tolerance ranges, certifications and an RFQ form
Process sub-pages[specific process] [city] or [process] [material]Process detail, equipment specs, typical uses, finishes you offer, a rough lead time and an RFQ form
Industry pages[industry] manufacturer or [industry] components What that industry needs, the certifications it expects, the parts you make for it and references from that sector
Quality and certificationsISO 9001 manufacturer Current certifications with scope and certificate numbers, plus how you inspect and report
Get a quote / RFQRFQ [process]Fields for material, process, quantity, tolerance and timeline, an NDA option and a secure file upload
About / companyAustralian manufacturer [process]When you started, your size, recent equipment, your team’s skills and Australian-made status where it applies

Title tags and meta descriptions

Google result for 'cnc machining sydney' with the blue headline labelled Title Tag and the snippet about custom industrial components labelled Meta Description

The title tag is the clickable headline in Google’s results. Lead with the process and location, and add one proof point such as a certification. Aim for 40 to 50 characters:

  • CNC Machining Sydney | ISO 9001 Precision Parts (47 characters)
  • Sheet Metal Fabrication NSW | ISO 9001 Certified (48)
  • Mining Equipment Manufacturer in [State] (40)

Keep certification claims to ones you hold. A brand name can go at the end if the full title stays within 55 characters. Since Google generally shows your site name with the listing, the brand is what to cut first.

The meta description is the snippet of text Google may show beneath the title. Name the process, the sectors and the RFQ step. For example: “CNC machining in Sydney for defence, mining and industrial parts. ISO 9001 certified, with an NDA available before design review. Request a quote.” (146 characters)

AI Search and Schema for Product Data

Google says there are no additional requirements and no special schema needed to appear in AI Overviews or AI Mode. A page must be indexed and able to show with a snippet, according to its AI features guidance. Specs written as plain text on an indexed page are therefore the version an AI answer can quote.

Fewer people click through when an AI summary appears. In a Pew Research study of US Google users, people clicked a normal result in 8% of visits when an AI summary was shown and 15% when it was not (March 2025 browsing data, Pew Research Center). For a manufacturer, the specs and certifications on the page have to be right, because the buyer may read them in the summary first. Check which of your pages AI answers already cite, then fix those first; AI search optimisation starts with that check.

Schema markup for manufacturers

Harbourview Manufacturing homepage headlined Precision Manufacturing Built for Industry beside ManufacturingBusiness schema code with labelled callouts

Schema markup is code that tells search engines what a page describes, such as a company, a plant or a product with set specs. Schema.org has no manufacturing business type, so use Organization for the company and LocalBusiness for each plant that buyers visit. Add Product markup to spec pages for standard products and catalogue items, using only specs shown on the page. Add BreadcrumbList to every page below the homepage. Google’s Search Central updates log shows FAQ rich results ended on 7 May 2026, after being limited to government and health sites from August 2023. FAQPage markup is therefore optional and will not produce a dropdown. It can still label your answers on lead time, minimum order quantity and file formats for search engines and AI tools.

Certifications and the Proof Buyers Check

Buying teams shortlist on evidence, and the proof that gets you through supplier checks also shows the experience and expertise that Google’s E-E-A-T framework describes.

Trust signalWhy it mattersHow to show it
Certifications and accreditationsISO 9001, AS9100 (aerospace), HACCP (food) and TGA (medical) are often required before a buyer will talk to you, and a tender can exclude a supplier that cannot show the right certificate.Show current scope, the certifying body and certificate number on About and capability pages, and remove certificates once they expire.
Equipment specificsA buyer judging your CNC work wants the working envelope, number of axes, materials and tolerance ranges.List machine makes, models, envelopes and tolerances. Engineers check these before they send an RFQ.
Australian-made and supply chainA reliable local supply chain is a priority for government and defence-related buyers.Where accurate, state Australian-made status, local sourcing and any buying panels you sit on.
Client sectors servedA mining buyer wants to know you have made parts for mining before.Name industries and part types where confidentiality allows. Case studies with names removed work too.
Certifications, IP and claims accuracy

Product safety, environmental, food grade and defence rules apply in some niches. State certification scope and expiry dates accurately. Never claim a certification you do not hold. A “made in Australia” claim needs the product’s last substantial transformation to have happened here, under the ACCC’s country of origin rules. The Australian Made logo uses the same test, and you can only use it through its licensing system. For defence or government panel claims, name the panel and confirm it is current.

Supplier Directories, Trade Press and Google Business Profile

Buyers on major projects can also find suppliers through buying networks without searching Google at all. Those listings send links and consistent business details back to your site too.

  • The Industry Capability Network runs Gateway by ICN, which connects major projects in Australia and New Zealand with suppliers. Make your profile there as specific as your capability pages.
  • Member lists of your industry associations are credible, relevant listings. Check that your name, address and phone match your website exactly.
  • Trade press titles such as Manufacturers’ Monthly and Australian Manufacturing cover new equipment, contracts and local capability. A story about a new machine or a defence contract can earn a relevant link back to your site, the core of good link building.

Google Business Profile for a factory

Hand holding a phone showing the AUSMFG Google Business Profile, an industrial manufacturer in Sydney rated 4.9 from 127 reviews

For manufacturers, the profile mostly confirms you are credible. A buyer who finds your capability page will check it to see where you are, that you are still trading and what recent reviews say. Choose the most specific category, such as Machine shop, Metal fabricator or Plastic products manufacturer. List every process and material under services. Add real photos of the factory floor and key equipment, with the make visible where you can.

RFQ Forms, NDAs and Internal Links

The request for quote is the main result a manufacturing site should produce. Ask for what your estimators need: material, process, quantity, tolerances where relevant, delivery timeline and contact details. If you want drawings up front, offer a secure file upload that takes the formats you quote from. Send each request straight into a custom CRM system so none sits unanswered.

Some prospects will not share designs without a non-disclosure agreement (NDA). A line on the RFQ page such as “NDA available on request before sharing specifications” answers that concern. If you do not have a standard agreement, an NDA template generator gives your lawyer a first draft.

Link process pages to the RFQ form

Site map from Home to About, Services, Industries, Locations, Resources and Contact, with pages like CNC Machining, Prototyping, Mining and Perth

Link the main capability page to each process page, and link each process page to the related industry pages. Link the quality page and RFQ page from every process and industry page, using link text that names the capability. Planning this information architecture before you add pages avoids a restructure later.

DestinationLink text examples
RFQ form“submit an RFQ”, “request a machining quote”, “quote this part”
Quality page“our ISO 9001 system”, “inspection and tolerance checks”, “current certification scope”
Industry page“mining sector components”, “our defence manufacturing work”, “parts for [industry]”

Connect Google Search Console, the free tool that shows how Google sees your site. Submit your sitemap, and inspect your process pages to confirm they are indexed.

Content Engineers Read Before an RFQ

Write the articles an engineer reads before sending an RFQ. Link each one to the capability page it supports. Four kinds are worth writing:

  • Capability explainers: what tolerances CNC machining can hold, when you need EDM, MIG versus TIG for structural work, and when injection moulding suits a part better than CNC.
  • Industry uses: choosing materials for high heat or underwater use, and how AS9100 affects an aerospace supply chain.
  • Buyer guides: how to prepare a drawing for an RFQ, what makes a part easy to make, and how to judge a supplier’s quality system.
  • Supply chain pieces: bringing work back onshore in defence and critical minerals, and what Future Made in Australia means for local buying.

Each article should name its author, carry a date and point to one process page. That link lets a reader with a technical question move straight to the capability that answers it.

Laptop showing Google Ads campaigns for CNC Machining, Sheet Metal Fabrication, Contract Manufacturing, Display Local Awareness and Remarketing

One contract can be worth more than a year of ad spend, so judge Google Ads management on the contracts it produces rather than on clicks or form fills.

SettingFor a manufacturer
Campaign structureOne Search campaign per process, so each budget follows what that work earns you.
Location targetingThe states or capital cities where your buyers are. A Sydney machining shop with national clients might start with Sydney and Melbourne.
Ad scheduleBusiness hours, when your estimators can respond.
BiddingStart with manual bids, where you set the most you will pay per click. Learn your lead-to-contract rate and average contract value before you set a target cost per acquisition.

This illustrative example shows how a starting budget works out. It assumes a $60 daily budget and uses the top-of-page bids for cnc machining sydney quoted in the FAQ below:

  • You set a daily budget of $60.
  • At $2.23 to $11.54 a click, that buys about 5 to 26 clicks a day.
  • Google may spend up to twice that on a busy day. Its daily budget rules cap the month at 30.4 times the daily amount, or about $1,824.

That is enough to see which searches lead to RFQs within a month or two, before you add more processes.

Once Google is profitable, test Microsoft Advertising campaigns on Bing. Microsoft lets you add LinkedIn profile targeting by company, industry and job function, which suits business buyers.

Keywords and negatives

Bid on process and material searches that include a place or the word quote. Examples are “CNC machining [city]”, “contract manufacturer ” and “[process] manufacturer quote”. Before launch, set up a shared negative keyword list, which stops ads showing on searches that contain those words. Put jobs, apprenticeship, course, training, DIY, hobbyist, what is, definition, software and simulation on it. Add small batch if your minimum order quantity is high.

Ad copy with checkable claims

Every claim in an ad should be one a buyer can check, such as a certificate, a machine or a lead time. The ACCC’s guidance on false or misleading claims applies to your ads as well as your website.

ComponentExample
Headline 1CNC Machining Sydney
Headline 2ISO 9001 Certified Machinists
Headline 3Precision Parts, 1 to 10,000
Description5-axis CNC machining for defence, mining and industry. ISO 9001. NDA available.

Capability Landing Pages for Ads

Factory homepage on a laptop with arrows to landing pages for CNC Machining, Sheet Metal Fabrication, Industrial Welding and Prototype & Assembly

Put machine specs, materials and certifications high on a landing page, because those are what an engineer checks. Each process campaign should point to its own page, built with custom landing page design. It should carry:

  • Equipment specs near the top on desktop: machine specs, working envelope and materials, ahead of company history.
  • Certifications with certificate number, scope and expiry, since buyers often cross-check them.
  • An RFQ form with material, process, quantity, tolerance class, timeline and file upload, and a clear NDA option.
  • A lead time range, such as “typical lead time 4 to 6 weeks for new orders”, which filters out rush jobs you cannot meet.
  • Real photos of your own factory floor and inspection equipment rather than stock images.

Tracking an RFQ to a Signed PO

Track every RFQ back to its source, then record the quote value and the signed purchase order (PO) against it. That record lets you compare contract revenue with what each channel cost.

StageWhat to recordWhy it matters
RFQ receivedProcess, material, quantity, source and dateShows how many requests come in and whether they fit your work.
Quote issuedQuote value, lead time quoted and dateShows the work in your pipeline.
Contract signed / PO receivedContract value, process, industry and sourceTells you what each channel returned for its cost.
First production runOn-time delivery, quality result and chance of a repeat orderShows whether the client is likely to stay.

Keep drawings, IP and design specs out of advertising data completely. Record conversions by type and date only. Use Google Analytics 4 (GA4) and Google Tag Manager to tie each RFQ to its source; GA4 and Tag Manager consulting can set this up. Because contracts can take months to sign, upload signed POs to Google Ads as offline conversions, which are sales recorded outside your website. Google’s bidding can then learn from real revenue.

A Phased Plan for a Manufacturer’s Website

Work in three phases, and finish each before you start the next. Ads only start in phase 3, once the spec pages they point to have been rewritten.

Phase 1: Get the facts right (first month)

  • Connect Google Search Console and check which process pages are indexed.
  • Check every certification on the site: current, correctly scoped and with certificate numbers.
  • Add the NDA option and secure file upload to the RFQ page.
  • Complete your Google Business Profile and ICN Gateway profile with specific processes and real photos.

Phase 2: Build the product data (months two and three)

  • Rewrite your main process page with machine specs, tolerances and materials in plain text.
  • Turn your most requested PDF spec sheets into web pages, with the PDF linked from each.
  • Add Organization, Product and BreadcrumbList markup that matches what the pages show.

Phase 3: Launch, measure and extend (from month four)

  • Launch one Search campaign for your main process in your main buyer region, and review its search terms weekly.
  • Work out cost per RFQ and cost per signed contract, with POs uploaded as offline conversions.
  • Build the next industry page for your most profitable client sector, and pitch one trade press story.

Manufacturing SEO and Google Ads: Questions Buyers Ask Us

Is SEO worth it for manufacturers when search volumes are low?

Yes, because one contract can be worth more than years of SEO, and specific searches still add up. CCM’s analysis of Google Keyword Planner data (Australia, 12 months to August 2026) shows about 170 searches a month for cnc machining sydney. A later CCM pull, on 1 October 2026, showed about 390 for steel fabrication sydney. A handful of qualified RFQs from those searches can cover the cost of the work.

How long does SEO for manufacturers take?

Pages for a niche process or material usually rank first, because fewer rivals target a process such as 5-axis machining or food-grade moulding. A broad term such as metal fabrication takes longer, because established suppliers hold most of page one on searches like it. A site with spec pages already indexed starts well ahead of a brochure site with its data locked in PDFs. The usual pattern is first movement at three to four months and larger gains by months six to nine. Results then keep building after the first year.

What does SEO cost for a manufacturing business?

The price depends mostly on how many processes, materials and industries need their own pages. It also depends on how much spec data must come out of PDFs and be rewritten as text. A crowded niche such as CNC machining in Sydney takes longer to win than a specialist process. As a benchmark, agency retainers run between $1,500 and $10,000+ a month. An in-house hire costs $80,000 to $170,000+ a year once tools and training are added. Both figures come from an agency and in-house cost comparison. Run your average contract value through the SEO ROI calculator to see how many contracts would cover it.

How do I start SEO for a manufacturing company?

Start with the one process you most want to quote on. Give it a page with machine specs, tolerances, materials and certifications in plain text. Link it to your RFQ form, and confirm in Google Search Console that Google has indexed it. Then repeat for the next process and your main industry.

What do Google Ads clicks cost for manufacturing searches?

Top-of-page bids for cnc machining sydney run from about $2.23 to $11.54, and for injection moulding from $1.76 to $10.24. Both bid ranges come from CCM’s Keyword Planner pull of 1 October 2026, not the data in Manufacturing Keywords by Process and Material. What you pay moves with your bid, your Quality Score (Google’s rating of your ad and page) and how many other shops bid that day. For that reason, judge results on cost per signed contract.

Should we publish spec sheets as PDFs or web pages?

Publish both, with the web page as the main version, since it can hold links and an RFQ form. Offer the PDF as a download from it, for engineers who want to file a copy.

Do manufacturers need special optimisation for AI Overviews?

No special work is needed, because Google’s position (see AI Search and Schema for Product Data) is that a page only has to be indexed and able to show a snippet. The useful work is keeping tolerances, materials and certificate details accurate and in plain text, because an AI summary will repeat them.

About the author

Andrei Jach is Senior Manager, SEO and Analytics Specialist at Click Click Media in Sydney, with over 15 years in digital marketing and strategy. He has led SEO across health, retail, professional services and manufacturing, and oversees strategic SEO planning, analytics implementation and technical audits. He previously worked at Agent 6 Marketing and Red Propaganda.

Implement this playbook with AI

Opens your assistant with this playbook and seven questions about your business: services, area, website and ads. It then writes your keyword map, page plan and Google Ads starter build with your details filled in.

Copy the prompt for Gemini, Grok or any assistant that cannot open a prefilled link. The prompt points at this page, which is also served as Markdown to assistants that ask for it.

Work with Click Click Media

An engineer with a drawing to place can check several supplier websites before calling anyone. Our free audit looks at yours the way that engineer would. It checks whether your machines, tolerances and certifications are written down, and whether the RFQ page makes it easy to send a drawing.

The audit also covers your Google Ads account and Google Business Profile. It ends with a ranked list of capability pages and RFQ steps to fix. Behind it is a Google Premier Partner agency, in search since 2008, with more than $115 million in Google Ads spend managed for Australian businesses.

We work with no lock-in contracts, and a senior strategist handles your account from the first week and stays your contact.

clickclickmedia.com.au · 1300 781 961 · Norwest, Sydney NSW · Google Premier Partner
Back
NORWEST BUSINESS PARK
Unit 307, 29-31 Solent Circuit,
Norwest NSW 2153